Construction machinery blog concretemixerpe@zzpioneer.com
Concrete Mixer
Related Topics

Cautions in Concrete Mixer Operation

Submitted by Cynthia,09/14/2012
 During the construction, do you operate the mixer in a right way? And how to operate it properly and safely? With years` experience of research and develop concrete mixer. PIONEER MACHINE MANUFACTURE CO.,LTD concludes the following steps.

The mixer shall be located in a flat and solid place, keep it fixed.
Add some water and leave the machine spin two to three minutes.And drain the water completely, especially in winter.
Check that whether all controller are in good conditions. Such as the driving clutch, the wire-rope and puller is good or not.
Keep the nontechnical workers away from it, when the feed hopper is lifted.
Be careful and forbid to put anything into the drum while the concrete mixer is at work.
Be sure the power cut off and the feed hopper being fixed when inspect the mixer.
The driver must be under professional training, and get though the test.
Clean the mixer everyday.
Except the daily inspection, the machine shall be given a unacquaintance under the professional engineers.




Please send us your inquiry, our team will respond you as soon as possible
*
*
*

(Please write down the product model or any requirement!)

Our business has reached in South Africa,Russia, Vietnam, India, Nigeria, Mongolia,Colombia, Bolivia, Libya, Saudi Arabia,Ecuador, etc.